Technology-Driven · Engineering Excellence
Jintu International
Engineering Limited
Advancing Underground Infrastructure for Tomorrow
Delivering safer, smarter, and more sustainable underground infrastructure through cutting-edge RTBM technology
Engineering Track Record
7 Representative Case Studies
工程業績與代表項目
Yuen Long South Underground Passage RTBM Project (Highway Crossing), Hong Kong
Section & Length
9.4m (W) × 4.38m (H) × 43.5m (L)
Technical Highlights
- ✓Double-Row Steel Sheet Pile Launch Structure : Adopted double-row steel sheet pile structure at the launch shaft to improve safety during RTBM launching in absence of vertical reinforcement capability.
- ✓Composite Thick Slurry Compensation Grouting (Hong Kong First) : Deployed composite thick slurry compensation grouting technology for the first time in Hong Kong, enabling ground deformation control at the millimeter level.
- ✓Segmented Modular RTBM Reception in Confined Shaft : Implemented segmented modular RTBM reception within a small, irregularly shaped receiving shaft where conventional methods were infeasible.
Nansha-Zhuhai Intercity Railway Xiangshan Station Track Laying RTBM Engineering, Guangdong
Section & Length
13.04m (W) × 9.61m (H) × 133.5m (L)
Technical Highlights
- ✓Cross-section 125m² at 26m depth — largest section, depth and water pressure for rectangular pipe-jacking in China
- ✓133.5m drive through soft silty soil
- ✓7.58m clearance from existing shield tunnels on both sides
- ✓No reception shaft — in-tunnel shell abandonment
- ✓Encountered reinforced ground, boulders and construction debris causing cutter-head and screw-conveyor blockages
Metro Line 5 Grand Theater Station Turnback Line & Line 9 Transfer Passage RTBM Project, Shenzhen
Section & Length
10.2m × 6.6m + 7m × 5m
Technical Highlights
- ✓Stacked-line pipe-jacking for turnback and transfer tunnel; single drive 140.4m
- ✓Through gravelly clay and fully weathered granite
- ✓Large RTBM overran Line 2 tunnel with only 3.2m vertical clearance
- ✓No normal reception conditions — large machine received in-tunnel then laterally shifted 118m for extraction
The Zhuhai Xingye Expressway (North Section) Tunnel, Zhuhai
Section & Length
10.4m (W) × 7.5m (H) × 90m (L)
Technical Highlights
- ✓Dual 4-lane carriageway; twin tubes at 2.5m spacing, total drive 180m
- ✓Underpassed active tram line and busy Meihua East Road
- ✓Underpassed DN1000 sewer with only 1m vertical clearance
- ✓Multi-arc near-rectangular section with high prefabrication precision requirements
- ✓Granite boulders and bedrock protrusions — pioneered China's first patented bedrock pre-treatment technology
Subaqueous RTBM Project Crossing the Beijing-Hangzhou Grand Canal, Suzhou
Section & Length
9.8m (W) × 5.9m (H)
Technical Highlights
- ✓South tube 154.9m / North tube 215.9m — no intermediate jacking stations used
- ✓Twice underpassed the UNESCO World Heritage Grand Canal with no pre-treatment
- ✓4.39m ultra-shallow cover under 15m water pressure through fine silty sand
- ✓First use of steel-strand tensioning to enhance rigidity and waterproofing in soft waterlogged ground
- ✓20+ authorised patents; results rated 'internationally leading'; multiple national science & technology awards
Utility Tunnel of Daxing International Airport Passing Beneath the Daguang Expressway, Beijing
Section & Length
9.1m × 5.5m + 7m × 5m
Technical Highlights
- ✓Twin-tube parallel drive at 1m spacing
- ✓Single drive 128.4m with no intermediate jacking station
- ✓First twin-tube rectangular pipe-jacking to underpass an expressway in China and Beijing
- ✓Identified and mitigated slope-toe instability risk; settlement control achieved
Shenzhen Huawei Banxuegang Science & Technology City Area Pedestrian Passage RTBM Project, Shenzhen
Section & Length
10.2m (W) × 6.6m (H)
Technical Highlights
- ✓Large 10.2×6.6m section suitable for dual 4-lane carriageway
- ✓Two drives of 138.3m and 143.9m — over 100m each without intermediate jacking stations
- ✓Successfully navigated spheroidal weathered granite boulders and multiple underground utilities
- ✓Three machines operating simultaneously
- ✓First application in China of high-efficiency permanent-magnet drive technology in a rectangular TBM
Our Services
RTBM Professional Services
Research & Development
In-house R&D of atypical shield & RTBM core tech, 70+ patents
Engineering
300+ completed projects, RTBM tunnel mileage over 20 km
Smart Equipment
45 RTBM machines of various specs, max section 13.04m x 9.61m
Digitalization & Sustainability
BIM & AI integration for green, low-carbon construction
Technological Innovation · 科技創新
70+ Patents
45 Full-Range RTBM Units
Jintu International holds over 70 patents in rectangular pipe-jacking technology and operates a full fleet of 45 RTBM units — with a maximum cross-section of 13.04×9.61m — covering extra-large, large, and medium-to-small project scales.
Explore Our Technology70+
Patents
技術專利
45
RTBM Units
全系列設備
24
Variants
設備規格
13.04×9.61m
Max Section
最大斷面
Ready to Start Your Next Engineering Project?
Our expert engineering team is ready to provide technical consultation and tailored solutions for your project.
Or call us at +852 2741 8862